STX 2.27% 21.5¢ strike energy limited

Ann: South Erregulla Update, page-268

  1. 93 Posts.
    lightbulb Created with Sketch. 22
    i found the wording of having to wait on additional equipment strange given logging trucks were already in the general area. hence the suggestion of coil tubing as reasoning for delay as less readily available and much cheaper than some of the alternatives. as for the loggers - given the what and if discussion on surveying techniques, if i had an (electrified) data transmittal unit onsite i would utilize the equipment to its maximum potential and run additional logs to address potential issues of lateral borehole instability as best practice reservoir management. if i have already paid for the electrified logging truck and crew to setup and shoot a few more holes - why not some additional real time data logs also ?
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
21.5¢
Change
-0.005(2.27%)
Mkt cap ! $629.3M
Open High Low Value Volume
21.5¢ 22.0¢ 21.3¢ $429.2K 1.970M

Buyers (Bids)

No. Vol. Price($)
54 934234 21.5¢
 

Sellers (Offers)

Price($) Vol. No.
22.0¢ 1408978 42
View Market Depth
Last trade - 12.33pm 24/05/2024 (20 minute delay) ?
Last
22.0¢
  Change
-0.005 ( 0.09 %)
Open High Low Volume
21.5¢ 22.0¢ 21.5¢ 448202
Last updated 12.51pm 24/05/2024 ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.