Drilling before end of calendar year - confirms that gap is filled between the Summer and Winter drilling at Kas. More than 6 months of constant drilling ahead of us now.
Look to my previous posts for Metal Creek Resources drilling results at the old Dona Lake Mine. Confirmed gold mineralisation at depth and they will be drilling again at the end of October. ADV targets on our tenements near the old mine will target to see if that mineralisation continues in South Limb although the main ADV targets are further down south.
- Forums
- ASX - By Stock
- Ann: South Limb Gold Prospect Ready to Drill
Drilling before end of calendar year - confirms that gap is...
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADV (ASX) to my watchlist
(20min delay)
|
|||||
Last
13.0¢ |
Change
0.010(8.33%) |
Mkt cap ! $8.127M |
Open | High | Low | Value | Volume |
13.0¢ | 13.0¢ | 13.0¢ | $6.118K | 47.06K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 41666 | 12.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.5¢ | 17366 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 41666 | 0.120 |
3 | 66963 | 0.115 |
1 | 50000 | 0.110 |
1 | 9521 | 0.105 |
2 | 211907 | 0.100 |
Price($) | Vol. | No. |
---|---|---|
0.135 | 17366 | 2 |
0.140 | 30449 | 2 |
0.145 | 53438 | 2 |
0.150 | 53866 | 3 |
0.155 | 9302 | 1 |
Last trade - 12.27pm 16/08/2024 (20 minute delay) ? |
Featured News
ADV (ASX) Chart |