On the bright side, a supply of IO from Africa to China means that there is no need for Shadang to panic and do a CR for UG as the main reason for Chinese investment into Australian IO was to secure a source of supply.
Supply from Africa means Shadang can afford to take their time and wait until Grange can self fund UG, as the Shadang controlled Grange BoD has already planned to do.
- Forums
- ASX - By Stock
- Ann: Southdown Magnetite Project Prefeasibility Study
On the bright side, a supply of IO from Africa to China means...
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GRR (ASX) to my watchlist
(20min delay)
|
|||||
Last
25.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $289.3M |
Open | High | Low | Value | Volume |
25.0¢ | 25.3¢ | 24.5¢ | $474.2K | 1.910M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 209963 | 24.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
25.0¢ | 211038 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 209963 | 0.245 |
26 | 552813 | 0.240 |
8 | 490169 | 0.235 |
15 | 142588 | 0.230 |
5 | 136625 | 0.225 |
Price($) | Vol. | No. |
---|---|---|
0.250 | 211038 | 2 |
0.255 | 85296 | 3 |
0.260 | 218423 | 6 |
0.265 | 627827 | 7 |
0.270 | 404551 | 6 |
Last trade - 16.10pm 31/10/2024 (20 minute delay) ? |
Featured News
GRR (ASX) Chart |