LOL. please have a look at the long section and the current drill programme. I have been through this with that MissSmallCrap.
The coloured shapes are the existing resource. Yes, already drilled out sufficient to estimate a resource. The current programme (white dots) is designed to better characterise mineralisation within that existing resource shape. How much of the drilling do you see plotting outside the resources shape? Don't get hung up on the 60m hole depth, they are inclined holes into a vertical zone of mineralisation.
This is where ESR is treading a very fine line....veering on the misleading side at the moment. The longsection presents as if their drillholes are testing a new area....which they are not. There is drilling well below this current programme also and yes, there is a bottom to the mineralisation.
- Forums
- ASX - By Stock
- ESR
- Ann: Spargoville Operations - Exceptional First Assays Received
Ann: Spargoville Operations - Exceptional First Assays Received, page-25
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ESR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.0¢ |
Change
-0.004(28.6%) |
Mkt cap ! $18.17M |
Open | High | Low | Value | Volume |
1.4¢ | 1.5¢ | 1.0¢ | $226.5K | 19.08M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 790000 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 1544902 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 790000 | 0.010 |
2 | 2300000 | 0.009 |
3 | 1143750 | 0.008 |
2 | 1250000 | 0.007 |
5 | 3287000 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.011 | 1544902 | 4 |
0.012 | 2713902 | 2 |
0.013 | 3000000 | 2 |
0.014 | 1750000 | 2 |
0.015 | 4251800 | 7 |
Last trade - 16.10pm 30/09/2024 (20 minute delay) ? |
Featured News
ESR (ASX) Chart |