NAE 0.00% 0.4¢ new age exploration limited

Ann: Spectacular Grade Intercepts at Redmoor Tin-Tungsten Project, page-27

  1. 18 Posts.
    lightbulb Created with Sketch. 2

    I couldn't agree with your sentiment more, it's shaping into an amazing project. I actually trained as a mining engineer down here and I can honestly say I have never heard of grades like this down here.


    From what I've seen we're going to be looking at a pretty large scale mine, to get the ore to Plymouth , the trucks would have to go through Callington town, which would never be allowed. If you processed in Plymouth, you would instantly drop the ore body recovery to around 80%, as you would lose backfilling as an option, meaning you couldn't recover your pillars - which would be sacrilege with grades like we're seeing. It's also doubtful whether the Drakelands MWF could take the additional waste.

 
watchlist Created with Sketch. Add NAE (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $7.175M
Open High Low Value Volume
0.4¢ 0.5¢ 0.4¢ $17.76K 4.409M

Buyers (Bids)

No. Vol. Price($)
39 28039222 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 2611120 1
View Market Depth
Last trade - 15.00pm 18/07/2024 (20 minute delay) ?
NAE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.