WRM 0.00% 6.3¢ white rock minerals limited

Ann: Spectacular High-Grade Zinc Drillhole Intersection, Alaska, page-18

  1. 919 Posts.
    lightbulb Created with Sketch. 150
    "4% Zn is a good grade"
    How did you conclude 4% Zn grade?
    https://hotcopper.com.au/data/attachments/3636/3636566-6dadc9e0e2c92db2d3b562b6bd7198eb.jpg


    The Dry Creek and West Tundra Flats (WTF) deposits at the Red Mountain VMS project already
    deliver an Inferred Mineral Resource6 of 9.1 million tonnes @ 157g/t silver, 5.8% zinc, 2.6% lead and
    0.9g/t gold for a grade of 13.2% ZnEq, or 609g/t AgEq. Of this total, the Dry Creek deposit contributes
    an Inferred Mineral Resource of 2.4 million tonnes @ 69g/t silver, 4.7% zinc, 1.9% lead and 0.4g/t
    gold for a grade of 8.8% ZnEq, or 406g/t AgEq.
 
watchlist Created with Sketch. Add WRM (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.