Some back of the envelope calculations.
Assumptions
20% ZnEq = $600/t
Average width of lode = 5m
depth = 500m
width = 500m
weight = 2t per m3
so
5m x 500m x 500 = 1250000m3 = 2500000t *600 = $1,500,000,000 gross
have i completely screwed this up?
- Forums
- ASX - By Stock
- WRM
- Ann: Spectacular High-Grade Zinc Drillhole Intersection, Alaska
Ann: Spectacular High-Grade Zinc Drillhole Intersection, Alaska, page-22
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)