You can do all the calculations that you wish but the end criterion is the cost of extraction. The higher results are at significant depth. I question the true width as the drill intercept was slightly oblique to the projected orebody.
- Forums
- ASX - By Stock
- WRM
- Ann: Spectacular High-Grade Zinc Drillhole Intersection, Alaska
Ann: Spectacular High-Grade Zinc Drillhole Intersection, Alaska, page-27
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)