Total capital cost has increased by about $24m for the CSPG plant vs the April 2023 DFS, no change for the USPG plant. So overall cost for the BAM facility = A$341.5m and for the Springdale mining and ore processing operations = A$75.7
Average annual revenue A$238.1m vs A$260.7m in the April 2023 DFS (using current exchange rates).
Increased cost of the BAM facility combined with the reduced revenue has resulted in the IRR dropping to 30.5% (41% in the April 2023 DFS).
Given the price pressure due to China's games and inflation I'm quite happy with this scoping study for the integrated mine to market scoping study.
Springdale mining and processing appears to be a bit dearer than I'd have liked however to have 100% control from mine to market is definitely worth it, and it is still cheaper than importing graphite according to the study.
- Forums
- ASX - By Stock
- Ann: Springdale-Collie Integrated Scoping Study
Total capital cost has increased by about $24m for the CSPG...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IG6 (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.1¢ |
Change
0.002(3.39%) |
Mkt cap ! $11.80M |
Open | High | Low | Value | Volume |
6.0¢ | 6.4¢ | 6.0¢ | $10.47K | 171.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 12139 | 6.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.4¢ | 53825 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 12139 | 0.060 |
1 | 7272 | 0.055 |
1 | 50000 | 0.052 |
3 | 121792 | 0.051 |
3 | 113000 | 0.050 |
Price($) | Vol. | No. |
---|---|---|
0.064 | 53825 | 1 |
0.067 | 25000 | 1 |
0.068 | 17002 | 1 |
0.070 | 37500 | 2 |
0.076 | 35000 | 1 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
IG6 (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online