CXO 13.6% 10.0¢ core lithium ltd

Ann: Stage 1 DFS and Updated Ore Reserves, page-92

  1. 861 Posts.
    lightbulb Created with Sketch. 94
    I think RJN is referring to the water level in Observation Hill Dam (OHD) on google earth.
    The image date was taken on the 20/7/20 and it looks very dry, as could be expected at that time of year.
    From an engineering perspective we are to construct an access road to OHD and a pipeline to draw what I understand is a primary feed to stock our own man made dams on site, I would expect this to be begin this year and might constitute on its own as " The start of construction ".
    However RJN refers to the EIS so I'm a little baffled myself as to his comment.
    Not expecting a reply, but any further comment Rummy ?
 
watchlist Created with Sketch. Add CXO (ASX) to my watchlist
(20min delay)
Last
10.0¢
Change
0.012(13.6%)
Mkt cap ! $213.6M
Open High Low Value Volume
8.8¢ 10.5¢ 8.8¢ $3.413M 34.89M

Buyers (Bids)

No. Vol. Price($)
12 1613594 10.0¢
 

Sellers (Offers)

Price($) Vol. No.
10.5¢ 5907724 76
View Market Depth
Last trade - 16.10pm 11/09/2024 (20 minute delay) ?
CXO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.