STAGE 1 OPERATIONS UPDATE
■ Altura has shipped four (4) cargoes totalling 24,000 dry metric tonnes to
Chinese based converters with the last cargo departing Port Hedland on 27
December 2018
■ Shipments have exceeded customer expectations with grade as high as
6.2% Li2O and averaging 6.1% Li2O, 1.04% Fe2O3 and 0.63% Mica
■ Altura plans to dispatch at least one shipment per month, moving to two
shipments when nameplate capacity is achieved.
- Forums
- ASX - By Stock
- 1MC
- Ann: Stage 1 Operations Update
Ann: Stage 1 Operations Update, page-7
-
- There are more pages in this discussion • 433 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 1MC (ASX) to my watchlist
|
|||||
Last
0.3¢ |
Change
0.001(20.0%) |
Mkt cap ! $18.53M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $3.621K | 1.257M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
121 | 181496973 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 20055545 | 43 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
121 | 181496973 | 0.002 |
28 | 97163809 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 19985545 | 40 |
0.004 | 11334360 | 30 |
0.005 | 4334936 | 10 |
0.006 | 5048396 | 8 |
0.007 | 11785490 | 8 |
Last trade - 15.53pm 04/07/2024 (20 minute delay) ? |
Featured News
1MC (ASX) Chart |