EPM 16.7% 0.7¢ eclipse metals limited.

Ann: Stage 2 Diamond Drilling Commencing at Mary Valley Project, page-23

  1. 3,463 Posts.
    lightbulb Created with Sketch. 869
    Nah $200k at least from QLD grant. Note they possibly have two operator licenses. Under Eclipse and Walla Mines Pty Ltd.
 
watchlist Created with Sketch. Add EPM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.