“The latest batch of results have again reinforced the consistent quality that appears inherent in the Steam Engine deposit. We have been very pleased with the consistent return of solid results over the course of the two drill programs executed during the latter five months of 2020. This has provided us with further confidence for an expedited pathway to early production.”
The Stage 2 drill results will be incorporated into a planned Pre-Feasibility Study, which will commence immediately after the delivery of the Steam Engine Project Scoping Study, expected shortly this month.Dinner Creek hasn't even been touched yet.
- Forums
- ASX - By Stock
- SPQ
- Ann: Stage 2 drilling strengthens Steam Engine Lode
Ann: Stage 2 drilling strengthens Steam Engine Lode, page-6
-
- There are more pages in this discussion • 30 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SPQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.001(12.5%) |
Mkt cap ! $18.01M |
Open | High | Low | Value | Volume |
0.8¢ | 0.9¢ | 0.8¢ | $4.179K | 499.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 3127236 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 1594095 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 3127236 | 0.008 |
12 | 4428088 | 0.007 |
8 | 8473332 | 0.006 |
2 | 376009 | 0.005 |
1 | 150000 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 1594095 | 10 |
0.010 | 2876374 | 8 |
0.011 | 3168333 | 7 |
0.012 | 4015460 | 6 |
0.013 | 2975990 | 9 |
Last trade - 13.52pm 17/05/2024 (20 minute delay) ? |
|
|||||
Last
0.9¢ |
  |
Change
0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
0.9¢ | 0.9¢ | 0.9¢ | 429900 | ||
Last updated 10.15am 17/05/2024 ? |
Featured News
SPQ (ASX) Chart |