AGY 3.95% 3.7¢ argosy minerals limited

Ann: Stage 2 Evaporation Ponds Progress Update, page-3

  1. 6,003 Posts.
    lightbulb Created with Sketch. 329
    29 August 2018 STAGE 2 EVAPORATION PONDS PROGRESS UPDATE _________________________________________________________________________________________ HIGHLIGHTS * Additional ~9ha Stage 2 evaporation pond completed
    * Lithium brine pumping commenced into new ~9ha pond
    * Currently, a total of ~19ha of Stage 2 evaporation ponds now operational and concentrating lithium brine via natural solar evaporation
    * Further Stage 2 evaporation pond construction works progressing
    Last edited by Beave: 29/08/18
 
watchlist Created with Sketch. Add AGY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.