Not sure, my initial thought was accommodation around MT Magnet for trucking hot swap site, but reading the announcement again looks like PRG will be looking after that. Possibly more storage around the Port.
But the question I have is .........." Why bother to Change to JORG 2012" of the existing 2004 JORG resource. I dont think they will be trying to extend it.
I only have one thought on this and if anyone out there can come up with more, would love to hear them.
- Forums
- ASX - By Stock
- GWR
- Ann: Stage 2 Mining Contract HOA Signed for C4 Iron Deposit
Ann: Stage 2 Mining Contract HOA Signed for C4 Iron Deposit, page-35
-
- There are more pages in this discussion • 54 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add GWR (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.3¢ |
Change
-0.004(4.60%) |
Mkt cap ! $26.66M |
Open | High | Low | Value | Volume |
8.7¢ | 8.7¢ | 8.3¢ | $5.194K | 61.69K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 174590 | 8.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.8¢ | 10000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 174590 | 0.083 |
1 | 250000 | 0.082 |
1 | 190000 | 0.081 |
2 | 135000 | 0.080 |
1 | 6798 | 0.078 |
Price($) | Vol. | No. |
---|---|---|
0.088 | 10000 | 1 |
0.091 | 700000 | 1 |
0.098 | 10000 | 1 |
0.100 | 279000 | 2 |
0.105 | 10000 | 1 |
Last trade - 14.21pm 04/10/2024 (20 minute delay) ? |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
GWR (ASX) Chart |