The December QTR should be released at the end of the month, this should give us a much better insight into how quickly we will need funds.
The only drilling I would agree with is for additional DSO, if we require more to de-risk the project to add additional years/initial volume.
NPV looks a lot better if we ramp up to 2mtpa quicker with a 7-year+ mine life.
It will be interesting to see how we will raise funds and how much we need
- Forums
- ASX - By Stock
- AKO
- Ann: Starts Pre-Feasibility Study for DSO at Bekisopa
Ann: Starts Pre-Feasibility Study for DSO at Bekisopa, page-14
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AKO (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.3¢ |
Change
-0.003(1.61%) |
Mkt cap ! $18.35M |
Open | High | Low | Value | Volume |
15.5¢ | 15.5¢ | 15.0¢ | $31.62K | 204.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 743582 | 15.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.5¢ | 119999 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 743582 | 0.150 |
1 | 200000 | 0.145 |
1 | 7142 | 0.140 |
1 | 100000 | 0.135 |
1 | 10000 | 0.130 |
Price($) | Vol. | No. |
---|---|---|
0.155 | 119999 | 1 |
0.160 | 50000 | 1 |
0.165 | 64000 | 2 |
0.170 | 35500 | 1 |
0.175 | 18721 | 1 |
Last trade - 13.10pm 04/06/2024 (20 minute delay) ? |
Featured News
AKO (ASX) Chart |