VR8 1.92% 5.3¢ vanadium resources limited

Ann: Steelpoortdrift and Tweefontein Projects Update, page-3

  1. 91 Posts.
    lightbulb Created with Sketch. 11
    A year and a half allocated for engineering and procurement in the revised timeline is absurd. The timeline in the presentation given in April 2022 had us producing by H1 2024. Now this is set for H2 2026. absolutely ridiculous blow out.
    https://hotcopper.com.au/data/attachments/5626/5626922-3bb71f4848e8cd3be222dcc4d4e36cd0.jpg
 
watchlist Created with Sketch. Add VR8 (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
0.001(1.92%)
Mkt cap ! $29.81M
Open High Low Value Volume
5.3¢ 5.3¢ 5.3¢ $398 7.5K

Buyers (Bids)

No. Vol. Price($)
1 10000 5.6¢
 

Sellers (Offers)

Price($) Vol. No.
6.0¢ 212514 4
View Market Depth
Last trade - 13.25pm 17/07/2024 (20 minute delay) ?
VR8 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.