E25 9.52% 23.0¢ element 25 limited

Page 24 of today's Investor Update indicates during the Stage 2...

  1. 11 Posts.
    lightbulb Created with Sketch. 4
    Page 24 of today's Investor Update indicates during the Stage 2 ramp up (within 12 months) to 1Mt per annum engineering design and costing in progress using DMS option
    Appears because of substantial capital costs as you referenced the option was deferred to be included with the ramp up changes
 
watchlist Created with Sketch. Add E25 (ASX) to my watchlist
(20min delay)
Last
23.0¢
Change
0.020(9.52%)
Mkt cap ! $50.57M
Open High Low Value Volume
21.5¢ 24.0¢ 21.5¢ $30.40K 137.5K

Buyers (Bids)

No. Vol. Price($)
3 134017 21.0¢
 

Sellers (Offers)

Price($) Vol. No.
23.0¢ 195 1
View Market Depth
Last trade - 16.10pm 26/07/2024 (20 minute delay) ?
E25 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.