Page 24 of today's Investor Update indicates during the Stage 2 ramp up (within 12 months) to 1Mt per annum engineering design and costing in progress using DMS option
Appears because of substantial capital costs as you referenced the option was deferred to be included with the ramp up changes
- Forums
- ASX - By Stock
- Ann: Stellantis complete first equity investment of US$15M in E25
Page 24 of today's Investor Update indicates during the Stage 2...
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add E25 (ASX) to my watchlist
|
|||||
Last
23.0¢ |
Change
0.020(9.52%) |
Mkt cap ! $50.57M |
Open | High | Low | Value | Volume |
21.5¢ | 24.0¢ | 21.5¢ | $30.40K | 137.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 134017 | 21.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
23.0¢ | 195 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 134017 | 0.210 |
3 | 52000 | 0.205 |
5 | 342504 | 0.200 |
1 | 5128 | 0.195 |
3 | 465128 | 0.190 |
Price($) | Vol. | No. |
---|---|---|
0.230 | 195 | 1 |
0.235 | 64736 | 1 |
0.265 | 9538 | 1 |
0.270 | 3980 | 1 |
0.275 | 15000 | 1 |
Last trade - 16.10pm 26/07/2024 (20 minute delay) ? |
Featured News
E25 (ASX) Chart |