IVZ 11.5% 8.7¢ invictus energy ltd

FUTURE TIMELINEAs a result, Invictus’ strategy and plans for...

  1. 1,106 Posts.
    lightbulb Created with Sketch. 1634
    FUTURE TIMELINE

    As a result, Invictus’ strategy and plans for developing its Cabora Bassa Basin assets are summarised below:

    • Completing post-well studies program to maximise insights from existing wells.
    • Reservoir engineering studies to determine how best to test and produce the Mukuyu reservoirs to inform likely development concept.
    • Refine well design, data acquisition program and well services contracts to deliver a reduction in future Mukuyu well costs by 40%.
    • Ongoing engagement with seismic, drilling and ancillary service providers to ensure equipment availability in Zimbabwe on favourable terms.
    • Conduct 3D seismic over the Mukuyu gas-condensate field to assist in delineating resources and reservoir connectivity to determine future well locations, high-grade areas of the field for early development and strategic locations for surface processing and distribution facilities.
    • Further appraisal drilling including well testing to build the resource base sufficiently and underpin future development.
    • Phased development of Mukuyu to generate early cashflow, maximise capital efficiency and optimise a larger scale full field development based on a full understanding of the available resource:
    o Pilot Phase: Expandable pilot project with onsite power generation or trucked compressed natural gas (CNG) to Eureka Gold Mine through the Himoinsa and Dallaglio Investments gas sale MOU.
    o Phase 1: Large scale gas to power through existing SAPP network underpinned by Mbuyu Energy.
    o Phase 2: Piped gas to large industrial consumers underpinned by Sable Chemicals.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
8.7¢
Change
0.009(11.5%)
Mkt cap ! $123.3M
Open High Low Value Volume
8.8¢ 9.4¢ 8.6¢ $857.2K 9.623M

Buyers (Bids)

No. Vol. Price($)
9 431942 8.6¢
 

Sellers (Offers)

Price($) Vol. No.
8.7¢ 39609 2
View Market Depth
Last trade - 10.54am 29/07/2024 (20 minute delay) ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.