PAN 0.00% 3.5¢ panoramic resources limited

Ann: Strategic Review of the Savannah Nickel Project, page-22

  1. 11,940 Posts.
    lightbulb Created with Sketch. 234
    I assume the wind down of operations will be;
    a) Stop active mining, recover loose ore underground only.
    b) run the process plant to use stockpiled ore.
    c) run out plant.
    d) clean plant and put on maintenance.

    Any news from the plant?
 
watchlist Created with Sketch. Add PAN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.