Yes sure possibly the best approach, especially if they will be able to test twice..
Remember though that MK-2 is a much straighter drill than MK-1, and that with MK-1 the well deteriorated not because of geological particular issues, but because of missing broken testing tools and the hole been left open for way too long.
Also part of MK-2 has been cemented already, I wonder if they could go down to Lower Angwa, test/sample and then cement, to carry on deeper afterward....and do the same.
Is MK-2 planned for production?
- Forums
- ASX - By Stock
- Ann: Strong Gas Shows in Multiple Upper & Lower Angwa Reservoirs
Yes sure possibly the best approach, especially if they will be...
-
- There are more pages in this discussion • 335 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
6.8¢ |
Change
0.002(3.03%) |
Mkt cap ! $96.41M |
Open | High | Low | Value | Volume |
6.8¢ | 6.9¢ | 6.6¢ | $241.7K | 3.584M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 62000 | 6.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 471553 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 62000 | 0.067 |
4 | 622000 | 0.066 |
5 | 687240 | 0.065 |
3 | 216877 | 0.064 |
3 | 172538 | 0.063 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 471553 | 3 |
0.070 | 482500 | 3 |
0.071 | 535913 | 4 |
0.072 | 1040000 | 4 |
0.073 | 1060000 | 3 |
Last trade - 15.15pm 21/06/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online