Positives -
- Fines circuit seems to be working well with consistent production and saleable product.
- Fines circuit is said to be the larger proportion of our output.
- Plant running at 80% of nameplate. Assuming fines production is half output that means running at 40% of nameplate (which is about 12kt/mth based on 30kt/mth at nameplate)
- 12kt/mth gives us a decent first shipment as fines circuit has been running for a while.
Negatives -
- DMS not quite where we need it to be yet.
- Grades is good but inconsistent.
- Iron is high - I don't see this as a significant cost because iron removal circuits were always expected. However I think things like this were probably included in stage 2 DFS when we got a higher opex number than the original DFS
Other noteable points.
Recoveries expected at 75% by Q4 which is only 5 weeks away. This to me suggests they are confident of ironing out the kinks in the DMS because we wouldn't be hitting 75% recoveries without the DMS working properly.
If we can be at 90% run rate and 75% recoveries and feeding good grade (we have a lot of 1.5% at surface) we could be producing 25kt/mth by October.
When I ran numbers a few months ago I budgeted about 80kt this calendar year which I think is still achievable.
Not writing off my 15kt first shipment call - might not reach it but I expect more than 5kt. We should be producing at least that each fortnight currently and they already have product to haul given the "imminent start"
- Forums
- ASX - By Stock
- Ann: Strong Progress at Pilgangoora as Production Ramps Up
Positives - - Fines circuit seems to be working well with...
- There are more pages in this discussion • 176 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PLS (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.14 |
Change
-0.100(3.09%) |
Mkt cap ! $9.465B |
Open | High | Low | Value | Volume |
$3.19 | $3.20 | $3.10 | $101.3M | 32.04M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
30 | 274897 | $3.13 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.14 | 246919 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
30 | 274897 | 3.130 |
43 | 435975 | 3.120 |
43 | 722839 | 3.110 |
160 | 700581 | 3.100 |
15 | 131047 | 3.090 |
Price($) | Vol. | No. |
---|---|---|
3.140 | 246919 | 7 |
3.150 | 268252 | 7 |
3.160 | 280065 | 7 |
3.170 | 93324 | 8 |
3.180 | 115577 | 19 |
Last trade - 16.10pm 17/06/2024 (20 minute delay) ? |
|
|||||
Last
$3.13 |
  |
Change
-0.100 ( 3.43 %) |
|||
Open | High | Low | Volume | ||
$3.17 | $3.20 | $3.10 | 15825747 | ||
Last updated 15.59pm 17/06/2024 ? |
Featured News
PLS (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online