EPM 0.00% 0.8¢ eclipse metals limited.

Ann: Strong Rare Earth Mineralisation at Gronnedal-Ika Area, page-144

  1. 478 Posts.
    lightbulb Created with Sketch. 241




    Can see more than some old fuel tanks. I can see a wharf that can harbor a Warship and quite a number of buildings. see pictures below

    You're point about starting drilling seems lacking, EPM have a few thousand cores which still require assaying. You know this as we have had this discussion under the "The pit has been professionally maintain since 2012 and still going". Just keep in mind NAMA have been looking after the tenement since 2012. On their site under Projects they intned to establish a JORC as well as
    https://hotcopper.com.au/data/attachments/3306/3306934-0c7b003e90ff63d68e727355241737c2.jpg
    You asked me how short I'm suggesting and I would only be guessing. if everything EPM announced comes to light, the Resource Upgrade, Mining License Application, Environmental Assessment and pit water testing and de-watering design, PFS targeted will be met.
    could see something after 12 months, to me for a international tenement we acquired at the start of the year is pretty short term.

    in-additional to the other 3 Australian tenements I think we will see a SP we are happy with. Including you Nro !!




    https://hotcopper.com.au/data/attachments/3306/3306884-f3a8d1ff8c9dd25e7c3ae7525d5ffb68.jpghttps://hotcopper.com.au/data/attachments/3306/3306878-e71da28f8b6bab58ec3f39fcfea3d1b9.jpghttps://hotcopper.com.au/data/attachments/3306/3306877-e637a0ce5fc80653820fffe89176277b.jpg
 
watchlist Created with Sketch. Add EPM (ASX) to my watchlist
(20min delay)
Last
0.8¢
Change
0.000(0.00%)
Mkt cap ! $18.00M
Open High Low Value Volume
0.8¢ 0.8¢ 0.8¢ $1.641K 205.1K

Buyers (Bids)

No. Vol. Price($)
4 2438572 0.7¢
 

Sellers (Offers)

Price($) Vol. No.
0.8¢ 926837 1
View Market Depth
Last trade - 14.54pm 15/07/2024 (20 minute delay) ?
EPM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.