Mintrex called it the raffinate pond, I think this is the tailings pond, another name for it.
"Mintrex has concluded that based on an expected nameplate copper cathode production level of 32,500 per tonne, measured cobalt in the raffinate pond and a copper to cobalt ratio derived from the Kipoi Mineral Resource there is sufficient cobalt potential within the current Kipoi copper leach circuit to justify further studies."
TGS Price at posting:
3.6¢ Sentiment: Buy Disclosure: Held