If cobalt costs are $8 as per industry average we are looking at a profit of $8 per pound which is $17,600 per tonne. x1,000 we have $17.6mil per annum For a project that costs 30-40mil.. Payback ratio is 2years and the general sentiment is that cobalt will go over $20lb just watch it over time.
- Forums
- ASX - By Stock
- TGS
- Ann: Study Confirms Potential Cobalt Production for Tiger-TGS.AX
Ann: Study Confirms Potential Cobalt Production for Tiger-TGS.AX, page-59
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review