TGS 0.00% 4.9¢ tiger resources limited

If cobalt costs are $8 as per industry average we are looking at...

  1. 2,468 Posts.
    lightbulb Created with Sketch. 1
    If cobalt costs are $8 as per industry average we are looking at a profit of $8 per pound which is $17,600 per tonne. x1,000 we have $17.6mil per annum For a project that costs 30-40mil.. Payback ratio is 2years and the general sentiment is that cobalt will go over $20lb just watch it over time.
 
watchlist Created with Sketch. Add TGS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.