"Can someone explain the issue with vertical drilling?"
From EV Surveys you should have an idea which way the orebody is dipping.
If it dipping vertically and you drill vertically you could be following the length.
Drilling at rightangles to the plane of the orebody returns a true thickness.
Assay results of HERC004 will give a better indication of the 3 rd dimention of the orebody.
- Forums
- ASX - By Stock
- Ann: Stunning 117m at 3.38% copper drill hit at Hermitage project
"Can someone explain the issue with vertical drilling?"From EV...
- There are more pages in this discussion • 34 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ERM (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.5¢ |
Change
-0.002(4.26%) |
Mkt cap ! $24.51M |
Open | High | Low | Value | Volume |
4.5¢ | 4.5¢ | 4.5¢ | $2.025K | 45K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 39799 | 4.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.7¢ | 53313 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 39799 | 0.045 |
2 | 45242 | 0.044 |
1 | 25000 | 0.040 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.047 | 53313 | 3 |
0.050 | 343950 | 2 |
0.051 | 209538 | 2 |
0.054 | 29800 | 1 |
0.059 | 28746 | 1 |
Last trade - 16.10pm 19/04/2024 (20 minute delay) ? |
Featured News
ERM (ASX) Chart |