Strike is investigating a concept design of a production system that could support up to 20 TJ/d supplied by ~2 wells from the main lobes of the Walyering gas field.
that = almost 19 mil cubic feet a day
TPD Price at posting:
0.9¢ Sentiment: Buy Disclosure: Held