If you knew that already why the f did you just ask if they were going to run logs?
"Forward Plan
Strike will continue drilling through the remaining High Cliff formation until reaching the Holmwood Shale. Drilling into the shale will be required to create a ‘pocket’ to allow for wireline logging tools to be run through the High Cliff and capture the best available data. Logging while drilling tools were not run through this section due to drilling restrictions at this depth.
Following reaching a final well TD, based upon the logging pocket, the well will be conditioned and the drilling bottom hole assembly will be pulled out of hole ready for wireline activities. A full suite of available logging tools will be run through the High Cliff and also gathering further data through the Kingia."
Have you actually even read the announcement?
- Forums
- ASX - By Stock
- WGO
- Ann: STX: West Erregulla 2 Update High Cliff
Ann: STX: West Erregulla 2 Update High Cliff, page-63
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)