WGO warrego energy limited

WEST ERREGULLA-2 UPDATE • Final casing string run to depth and...

  1. 15,673 Posts.
    lightbulb Created with Sketch. 408
    WEST ERREGULLA-2 UPDATE
    • Final casing string run to depth and cemented in place

    Since the last update, Strike has successfully run the final 5-1/2” casing string in the West Erregulla 2 well. The casing was set at a depth of 5,090m and cemented in place, safely securing the exciting Kingia and High Cliff gas discoveries at West Erregulla.
    Forward Plan
    Given the excellent results seen to date and the quality of the Kingia gas discovery, the well is likely to be physically constrained with the flowrate from the Kingia alone. As such, Strike is preparing to perforate the well across the Kingia interval before running the completion assembly and 3-1/2” tubing string. Flow tests of the High Cliff and Wagina gas discoveries will be planned and prepared for in the near future.
    Once the well is completed, the rig will be demobilised to allow the production flow test to be conducted.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.