MSB 2.08% 94.0¢ mesoblast limited

F. If the resubmission is incomplete:1. Ensure the designation...

  1. 41 Posts.
    lightbulb Created with Sketch. 31
    F. If the resubmission is incomplete:
    1. Ensure the designation in the regulatory system is corrected to
    “Incomplete Response to CR letter” if the review team confirms that the
    submission did not address all issues identified in the CR letter. [RPM]
    a. The data entry in the regulatory system should reflect receipt of an
    Incomplete Response to CR letter rather than a complete response.
    b. When the information in the system is corrected, the review clock is
    re-set to reflect the original action close date.
    2. Notify the applicant within 14 calendar days if the submission is
    determined to be an incomplete response via email or telephone
    . [RPM]
    3. Ensure all communications are documented in the appropriate regulatory
    system and uploaded through CBER Connect.

    Should that say we are pretty safe from any bad news?
 
watchlist Created with Sketch. Add MSB (ASX) to my watchlist
(20min delay)
Last
94.0¢
Change
-0.020(2.08%)
Mkt cap ! $1.073B
Open High Low Value Volume
95.5¢ 97.0¢ 93.5¢ $1.424M 1.507M

Buyers (Bids)

No. Vol. Price($)
8 29390 93.5¢
 

Sellers (Offers)

Price($) Vol. No.
94.5¢ 14089 2
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
MSB (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.