FME 5.88% 1.8¢ future metals nl

"Basically saying they've done nothing the past few months so...

  1. 3,133 Posts.
    lightbulb Created with Sketch. 551

    "Basically saying they've done nothing the past few months so they looked back at historical drilling."

    As per last QTR, they're undertaking a +10,000m diamond core drilling programme commenced in August 2021. Drilling was ongoing with ~5500M left to drill (see screenshot below).......they've updated the progress to 6000m drilled in this Ann (see below), so ~4000M left to drill......kind of slow going?

    Also, were are the lab results? We have 5 results reported in the last QTR, that's it.


    Sep QTR

    https://hotcopper.com.au/data/attachments/3873/3873332-9c14ad583597a634fa24365303f78141.jpg


    This Ann

    https://hotcopper.com.au/data/attachments/3873/3873351-1fe533a0eac95e1988396c6a8e864bc6.jpg

 
watchlist Created with Sketch. Add FME (ASX) to my watchlist
(20min delay)
Last
1.8¢
Change
0.001(5.88%)
Mkt cap ! $10.35M
Open High Low Value Volume
1.8¢ 1.8¢ 1.8¢ $8.127K 451.5K

Buyers (Bids)

No. Vol. Price($)
3 706066 1.7¢
 

Sellers (Offers)

Price($) Vol. No.
1.8¢ 1087 1
View Market Depth
Last trade - 12.20pm 16/08/2024 (20 minute delay) ?
FME (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.