WR1 0.00% 96.5¢ winsome resources limited

"Intersections reported in this announcement confirm the...

  1. 27,013 Posts.
    lightbulb Created with Sketch. 3147
    "Intersections reported in this announcement confirm the continuity of lithium mineralisation to the east and
    west of Adina Main. With the receipt of these results drilling has now defined lithium mineralisation at
    Adina at close spacing over a strike length of 1km, representing the core of the 3.1km of mineralisation
    defined by drilling at Adina1
    . Drilling stepped out some 250m to the east and a further 150m to the west,
    systematically testing mineralisation on a spacing of approximately 100m x 100m. Mineralisation remains
    open to the east and west of drilling.
    All drillholes tested both the Main Zone and the recently discovered Footwall Zone, with thick, high-grade
    intersections received from both zones as detailed in Tables 1 and 2 above. New results received are
    shown on Figures 1 and 2 with all data from the programme to date included in the Appendices. A total of
    76 holes had been completed for 22,500 metres at the time drilling was suspended. Assays have now
    been received for 62 of these drillholes.
    Results are still pending from holes drilled to test the up-dip extension of the Footwall Zone, closer to
    surface (Figure 3). Forthcoming drilling will focus on testing extensions to higher grade mineralisation in
    both the Main and Footwall Zones, to ensure these zones are well defined prior to resource modelling
    later in 2023."
 
watchlist Created with Sketch. Add WR1 (ASX) to my watchlist
(20min delay)
Last
96.5¢
Change
0.000(0.00%)
Mkt cap ! $184.1M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 625 96.5¢
 

Sellers (Offers)

Price($) Vol. No.
84.5¢ 13706 1
View Market Depth
Last trade - 16.16pm 14/06/2024 (20 minute delay) ?
WR1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.