PDI 13.2% 23.0¢ predictive discovery limited

Ann: SUBSTANTIAL OXIDE GOLD ZONE EMERGING AT NE BANKAN PROJECT, page-29

  1. 27,154 Posts.
    lightbulb Created with Sketch. 1759
    No, PDI will be releasing further infill drilling results required for the JORC mid 2021.

    "The initial oxide infill drill program is ongoing at NE Bankan and is expected to continue over the coming weeks. Following completion of this program and receipt of the deeper drilling RC and DD results, a systematic infill drill program will be planned in anticipation of the Maiden Resource Estimate planned for mid-2021"
    Last edited by AlCp: 05/03/21
 
watchlist Created with Sketch. Add PDI (ASX) to my watchlist
(20min delay)
Last
23.0¢
Change
-0.035(13.2%)
Mkt cap ! $540.7M
Open High Low Value Volume
26.0¢ 26.5¢ 22.0¢ $4.978M 20.71M

Buyers (Bids)

No. Vol. Price($)
6 595637 22.5¢
 

Sellers (Offers)

Price($) Vol. No.
23.5¢ 546259 3
View Market Depth
Last trade - 16.10pm 30/08/2024 (20 minute delay) ?
PDI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.