No, PDI will be releasing further infill drilling results required for the JORC mid 2021.
"The initial oxide infill drill program is ongoing at NE Bankan and is expected to continue over the coming weeks. Following completion of this program and receipt of the deeper drilling RC and DD results, a systematic infill drill program will be planned in anticipation of the Maiden Resource Estimate planned for mid-2021"
- Forums
- ASX - By Stock
- Ann: SUBSTANTIAL OXIDE GOLD ZONE EMERGING AT NE BANKAN PROJECT
No, PDI will be releasing further infill drilling results...
- There are more pages in this discussion • 64 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PDI (ASX) to my watchlist
(20min delay)
|
|||||
Last
24.5¢ |
Change
0.025(11.4%) |
Mkt cap ! $508.6M |
Open | High | Low | Value | Volume |
22.5¢ | 24.5¢ | 22.5¢ | $1.107M | 4.651M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 150442 | 23.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
24.5¢ | 661630 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 150442 | 0.230 |
1 | 22222 | 0.225 |
1 | 14600 | 0.205 |
5 | 170510 | 0.200 |
2 | 255250 | 0.195 |
Price($) | Vol. | No. |
---|---|---|
0.245 | 411630 | 2 |
0.250 | 602605 | 10 |
0.255 | 100000 | 2 |
0.260 | 204907 | 6 |
0.265 | 102500 | 2 |
Last trade - 16.10pm 19/04/2024 (20 minute delay) ? |
|
|||||
Last
23.5¢ |
  |
Change
0.025 ( 4.44 %) |
|||
Open | High | Low | Volume | ||
22.8¢ | 25.0¢ | 22.5¢ | 1284131 | ||
Last updated 15.59pm 19/04/2024 ? |
Featured News
PDI (ASX) Chart |