Hello. I took a guess at this based on the text below. I guess...

  1. 7,002 Posts.
    lightbulb Created with Sketch. 657
    Hello. I took a guess at this based on the text below. I guess PTR need to drill around another 4,800 metres to Indicated JORC the current Rosewood area. Therefore, it appears PTR can achieve a lot with the new 6,000 metre drilling program.

    The last drill program did around 51 drill holes; most are around 200 metres apart, except for others around 400 metres apart. I guess around 22 drill holes can infill these 400 metre spaces, which will total around 2,400 metres for the existing 7 drill lines. Then PTR can drill another 12 drill lines for around 4,100 metres. Total new drilling is 4,800 metres.

    However to drill 4km x 2km for the area north would be 9 x 11 x 33 = 3,300 metres. This said, this is not important for an Indicated JORC, unless the exploration drilling finds superior results.

    https://hotcopper.com.au/data/attachments/6860/6860220-299a1341f3ee72d1c0fdcec0c1471f3a.jpg



 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
30.0¢
Change
0.005(1.69%)
Mkt cap ! $103.6M
Open High Low Value Volume
29.5¢ 30.0¢ 29.0¢ $106.8K 365.3K

Buyers (Bids)

No. Vol. Price($)
1 106156 29.0¢
 

Sellers (Offers)

Price($) Vol. No.
30.0¢ 179999 1
View Market Depth
Last trade - 16.10pm 13/06/2025 (20 minute delay) ?
PTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.