So, I've been thinking. Pilot scoped down to carbonate, limiting the so-called-DFS to carbonate.
It's pretty useless, unless you know you're aiming for carbonate production. The figures in there are the basis for FID and financing, so go figure. You're not going to get money to build a hydroxide flowsheet based on that.
So I think the primary offtake partner(s) we're looking at want carbonate and pretty much all we can produce at the beginning. Hopefully Tesla LFP. Not ideal, not terribl
This would allow for the hydroxide study to be delayed and go in parallel with the so called increased production study and updated DFS also mentioned in the latest interview. So it's possible that hydroxide is the target for whatever increase we can make in a possible phase 2.
What else can it be? (Beyond of course KC getting desperate to report anything incremental, even if pointless.)
- Forums
- ASX - By Stock
- Ann: Successful Battery-Grade pilot programme for Cinovec Project
EMH
european metals holdings limited
Add to My Watchlist
5.71%
!
16.5¢

So, I've been thinking. Pilot scoped down to carbonate, limiting...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
16.5¢ |
Change
-0.010(5.71%) |
Mkt cap ! $34.22M |
Open | High | Low | Value | Volume |
17.5¢ | 17.5¢ | 16.5¢ | $47.20K | 278.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 183034 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.5¢ | 2568 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 183034 | 0.165 |
1 | 10000 | 0.160 |
1 | 100000 | 0.155 |
1 | 100000 | 0.120 |
2 | 19099 | 0.110 |
Price($) | Vol. | No. |
---|---|---|
0.175 | 2568 | 1 |
0.180 | 29587 | 1 |
0.190 | 12100 | 2 |
0.200 | 666 | 1 |
0.205 | 100000 | 1 |
Last trade - 15.10pm 24/06/2025 (20 minute delay) ? |
Featured News
EMH (ASX) Chart |