CE1 10.0% 0.9¢ calima energy limited

>>, the Company commenced construction on the pipeline right of...

  1. 1,577 Posts.
    lightbulb Created with Sketch. 298
    >>, the Company commenced construction on the pipeline right of way that will connect the A-54-C pad containing Calima #2 and #3 to our Tommy Lakes infrastructure.

    right of way widened from pad to about half way to tommy...

    left 28 Jan, right 9 Mar
    https://hotcopper.com.au/data/attachments/5118/5118925-67195f4e3bda6fd9725eac2eff8c898a.jpg

 
watchlist Created with Sketch. Add CE1 (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
-0.001(10.0%)
Mkt cap ! $5.701M
Open High Low Value Volume
0.9¢ 0.9¢ 0.9¢ $32.74K 3.637M

Buyers (Bids)

No. Vol. Price($)
3 1352220 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 3086937 13
View Market Depth
Last trade - 10.12am 20/06/2024 (20 minute delay) ?
CE1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.