I expect they have 2 control ponds.
Control pond 1 is fully lined. This pond allows for calculation of evaporation.
Control pond 2 has lined side walls. This pond allows for calculation of base seepage.
The third pond is continuously topped up. The rate of filling minus the rate of evaporation minus the rate of base seepage gives you side wall seepage.
Performing the studies over a prolonged period will give steady state rates.
- Forums
- ASX - By Stock
- APC
- Ann: Successful Pre-concentration Pond Optimisation
APC
apc minerals limited
Add to My Watchlist
0.00%
!
0.9¢

Ann: Successful Pre-concentration Pond Optimisation, page-5
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.636M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 699734 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.0¢ | 1377203 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 699734 | 0.009 |
11 | 2529062 | 0.008 |
12 | 3246730 | 0.007 |
9 | 2331715 | 0.006 |
4 | 1220000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 1377203 | 5 |
0.011 | 4121495 | 3 |
0.012 | 298023 | 3 |
0.013 | 136336 | 4 |
0.014 | 1095000 | 2 |
Last trade - 16.21pm 21/07/2025 (20 minute delay) ? |
Featured News
APC (ASX) Chart |
Day chart unavailable