Highlights
Base case 1Mtpa project delivers 32,000tpa zinc, 12,000tpa copper over 12 years
- Pre-tax NPV8% of A$338M and 52% IRR at study prices
-Peak Cash Draw of A$183M
- Forecast life-of-mine pre-tax cash-flow of A$601M; 1.6 year capital pay-back -C1 cost US$0.14/lb payable zinc
- Project significantly enhanced by potential to treat supergene mineralisation through proposed flotation plant
- Excellent exposure to strengthening zinc and copper prices
-Low capital option to increase production rate to 1.25Mtpa
-Further opportunities to add value through exploration
- Forums
- ASX - By Stock
- DVP
- Ann: Sulphur Springs Value Engineering Study
Ann: Sulphur Springs Value Engineering Study, page-2
-
- There are more pages in this discussion • 57 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DVP (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.17 |
Change
0.040(1.88%) |
Mkt cap ! $559.9M |
Open | High | Low | Value | Volume |
$2.14 | $2.18 | $2.09 | $1.306M | 610.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 600 | $2.11 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.18 | 4054 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 888 | 2.080 |
1 | 1500 | 2.040 |
2 | 7000 | 2.000 |
1 | 505 | 1.975 |
2 | 1400 | 1.960 |
Price($) | Vol. | No. |
---|---|---|
2.200 | 15011 | 2 |
2.210 | 1000 | 1 |
2.220 | 1472 | 1 |
2.240 | 450 | 1 |
2.250 | 7686 | 3 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
DVP (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online