Really?
I've got a few questions...
1. Can anyone point me to the metalurigcal testwork for this deposit? what year it was done?
2. Development ready - Can anyone tell me where they are at in the pre feas/feasibility stages and/or permitting stages?
3. Can anyone justify their current pricing assumptions for copper - seems aggressive.
4. why use NPV 8% for such a robust project?
Mainly the 1st point is what would worry me.. it is a very aggresive assumption without testwork to say you'll get 55% Zn concentrate at 93% recovery AND 26% copper con at 90% recovery. Most deposits normally sit around 65-75% of one and 70-85% of the other, depending which one is targetted first (they are doing sequential flotation, not bulk here according to their flowsheet). If there is testwork to back it up, no problem at all and it sounds great I just cannot find any.
- Forums
- ASX - By Stock
- DVP
- Ann: Sulphur Springs Value Engineering Study
Ann: Sulphur Springs Value Engineering Study, page-35
-
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DVP (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.09 |
Change
-0.040(1.88%) |
Mkt cap ! $539.3M |
Open | High | Low | Value | Volume |
$2.13 | $2.14 | $2.07 | $1.084M | 515.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 620 | $2.08 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.10 | 4864 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 620 | 2.080 |
2 | 29864 | 2.070 |
1 | 4864 | 2.060 |
2 | 1250 | 2.050 |
2 | 6842 | 2.030 |
Price($) | Vol. | No. |
---|---|---|
2.100 | 4864 | 1 |
2.110 | 4864 | 1 |
2.140 | 2461 | 2 |
2.150 | 2760 | 1 |
2.160 | 24172 | 3 |
Last trade - 16.10pm 22/08/2024 (20 minute delay) ? |
Featured News
DVP (ASX) Chart |
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O'Donovan, Executive Director
Gerard O'Donovan
Executive Director
SPONSORED BY The Market Online