DVP 0.95% $2.12 develop global limited

Ann: Sulphur Springs Value Engineering Study, page-7

  1. 1,007 Posts.
    lightbulb Created with Sketch. 225
    No idea what NST's long term strategy is, but buying this out wouldn't be a crazy thing for them to do if they want to diversify out of gold. NST already own 13.5%, have $300m cash and the timing is right with the outlook for zinc and copper looking very good.

    I thought it was curious when NST first took a stake in VXR as at that stage NST were a fledgling company and XVR was a bit left field. Maybe Bill Beaumont was thinking long term? He is not afraid to have a go and the payback for the required $200m capital is only about 18 months.

    Wonder what the project would be worth? A quarter of todays NPV of $338m, or $84m, or about 3.2c a share would be hard to turn down.
 
watchlist Created with Sketch. Add DVP (ASX) to my watchlist
(20min delay)
Last
$2.12
Change
0.020(0.95%)
Mkt cap ! $547.0M
Open High Low Value Volume
$2.10 $2.16 $2.05 $928.8K 438.5K

Buyers (Bids)

No. Vol. Price($)
2 5476 $2.10
 

Sellers (Offers)

Price($) Vol. No.
$2.12 1332 3
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
DVP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.