WKT 1.04% 9.7¢ walkabout resources ltd

That 500kva transformer won't be emough to power the plant...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 3,100 Posts.
    lightbulb Created with Sketch. 1170
    That 500kva transformer won't be emough to power the plant Stirer. A minimum of 1.0 mVA to 1.5 mVA will be required, i.e. two to three times the capacity of the transformer tweeted. Furthermore you'll need another set of transformers to connectto the diesel backup generators - the grid electricity has many outages and is subject to frequent load shedding in Tanzania. What about all the other power. reticulation equipment such as bus bars, switches, cables and control boxes? Then you have to install and commission it. To claim that you have power to site is ludicrous.
 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.