The hardest part of investing is The Waiting. Need a few big volume days to clean out the sewer then slow rise will do.
- Forums
- ASX - By Stock
- Ann: Surat 2020 Work Programme Update
The hardest part of investing is The Waiting. Need a few big...
-
- There are more pages in this discussion • 34 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AJQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.31M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares
AJQ (ASX) Chart |
Day chart unavailable