So basically its a Slap and Tickle Announcement.
Tickle is:
Strike length appears extended by 3/4 of a kilometer. On a 150 meter depth thats a truckload more tonnage.
Slap is:
Drilling actually commencing in January.
Which is a fairly common occurrence. Delayed drilling.
Slap n Tickle over Xmas period!!...lol.
- Forums
- ASX - By Stock
- AVZ
- Ann: Surface results confirm extension to Carrier De L'est
Ann: Surface results confirm extension to Carrier De L'est, page-15
-
- There are more pages in this discussion • 244 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online