So they have identified conflicts before any type of construction has began and made it correct. Sounds like they have done a good job reviewing the design and identifying an error rather than coming across it during the building phase.
You have zero information about what is happening on the ground and what changes are being discussed between an engineering firm and a company planning the construction of a pilot plant.
You Golden Goose bought shares at an ATH and lost your money. It was always going to come back down and you only have your self to blame.
Time to put your big he/she pants on and chill out. Even your phone or computer is sick of your misinformed information.
- Forums
- ASX - By Stock
- BEZ
- Ann: Suspension extension
Ann: Suspension extension, page-201
Featured News
Add BEZ (ASX) to my watchlist
|
|||||
Last
9.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $41.39M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
BEZ (ASX) Chart |
Day chart unavailable
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online