AUZ 5.26% 0.9¢ australian mines limited

Ann: Suspension from Official Quotation, page-192

  1. 3,068 Posts.
    lightbulb Created with Sketch. 4564
    Hi JPS
    No the certification is regarding the autoclave as a pressure vessel to Aust Standards and checking it is built as by ASME. All presure vessels in Aust must be certified before use and as a statutory requirement are rechecked and certfied at a 2 yrly interval. This check is carried out to coincede with a major shutdown with a external and internal inspection is carried out and nucleonic xrays on welds are examined for minute cracks or fissures which would denote a weak spot requiring repair.
    Also there wil be a small boiler associated with the demo plant that the certification will be checked and also a person to operate must also have completed and possess a current Boiler Attendants Ticket.
 
watchlist Created with Sketch. Add AUZ (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
-0.001(5.26%)
Mkt cap ! $12.58M
Open High Low Value Volume
1.0¢ 1.0¢ 0.9¢ $16.19K 1.620M

Buyers (Bids)

No. Vol. Price($)
20 2868655 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 4365180 22
View Market Depth
Last trade - 11.25am 22/07/2024 (20 minute delay) ?
AUZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.