AUZ 5.26% 1.0¢ australian mines limited

Hi JPS No the certification is regarding the autoclave as a...

  1. 3,068 Posts.
    lightbulb Created with Sketch. 4564
    Hi JPS
    No the certification is regarding the autoclave as a pressure vessel to Aust Standards and checking it is built as by ASME. All presure vessels in Aust must be certified before use and as a statutory requirement are rechecked and certfied at a 2 yrly interval. This check is carried out to coincede with a major shutdown with a external and internal inspection is carried out and nucleonic xrays on welds are examined for minute cracks or fissures which would denote a weak spot requiring repair.
    Also there wil be a small boiler associated with the demo plant that the certification will be checked and also a person to operate must also have completed and possess a current Boiler Attendants Ticket.
 
watchlist Created with Sketch. Add AUZ (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
0.001(5.26%)
Mkt cap ! $13.28M
Open High Low Value Volume
1.0¢ 1.0¢ 1.0¢ $16K 1.6M

Buyers (Bids)

No. Vol. Price($)
17 2511150 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 4271370 21
View Market Depth
Last trade - 09.59am 22/07/2024 (20 minute delay) ?
AUZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.