The investor presentation prior to the big cap raise set out the contingency, debt service facility and other cash requirements. Totted up these came to $50M above and beyond the estimated capital cost, accrued opex during construction and interest costs.
The total funds available were supposed to $263M.
We have had notification of 145 CP's being met and at least one loan being made available.
A few people are saying cap raise but it would be quite extraordinary if $260M is available and they have blown through the $29M contingency so soon.
As for the damaged plastic liner theory, an onsite photograph shows the poly weighted down by green sand bags. It is a plausible idea. We were told that 60Ha had been lined.
It will be interesting to see what the outcome is
- Forums
- ASX - By Stock
- Ann: Suspension from Official Quotation
The investor presentation prior to the big cap raise set out the...
-
- There are more pages in this discussion • 47 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $2.499M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KLL (ASX) Chart |
Day chart unavailable
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online