If its say 240mt then valuation is $100m per 10mt that puts Andover at $2.4bil.
Andover with clear production pathway with its infrastructure already on site , each 10mt is worth $300m so is $7.2bil. Split the middle we get $4.8bil
$4.8bil for the total project at 240mt with plenty more tonnage upside imo.
- Forums
- ASX - By Stock
- Ann: Suspension from Official Quotation
If its say 240mt then valuation is $100m per 10mt that puts...
-
- There are more pages in this discussion • 72 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)